Rooftop Air Conditioner Removed
30 March 2025; We have finally removed the rooftop air conditioner. This was removed to make way for the third string of solar panels,...
Mar 30


Recirculating Shower
24 May 2025; finally, after a very long process of having to make a sheet metal bending tool and cutting then bending the required sheet...
Nov 4, 2024


First String of Solar Panels Installed
6 April 2023; the first of three solar panel "strings" is installed. This consists of four 190w moncrystalline panels, charging a number...
Apr 6, 2023


Licensed!
6 February 2023; today was the second time the bus went over the pits after fixing the issues detected by the inspector, and it's now...
Feb 6, 2023


The Coolant Leak Fix
16 January 2023; The first thing we had to fix was the coolant leak, and on this day we finally fixed it. It involved taking off the...
Jan 16, 2023


Seats Removed
14 January 2023; the seats have been finally removed to make way for the various sections of our mobile workshop and office space. Seven...
Jan 14, 2023


The Conversion Kick-Off
5 January 2023; an unlicensed coach was purchased to kick off our mission to convert it to a zero carbon heavy vehicle. The plan is to...
Jan 5, 2023


Prototype Mark III
1 February 2015; this protype was built to revisit the technology used by s1r9a9m9, once it was understood exactly how it worked. The...
Feb 1, 2015


Prototype Mark I
29 December 2008; after five months of research into various ways to of using water in an engine, a combustion chamber was built to...